Pourashava | Diameter | Pipeline in km | Installation Year |
---|---|---|---|
Division: Rajshahi, District: Naogaon, Upazila: Naogaonsadar, Pourashava: Naogaon | 200mm (8 inch) | 5.570 KM | 2024 |
Division: Sylhet, District: Moulvibazar, Upazila: Kulaura, Pourashava: Kulaura | 250mm (10 inch) | N/A | 2023 |
Division: Barishal, District: Bhola, Upazila: Bhola Sadar, Pourashava: Bhola | 200mm (8 inch) | 21.08 Km | 2023 |
Division: Rajshahi, District: Sirajganj, Upazila: Belkuchi, Pourashava: Belkuchi | 200mm (8 inch) | 4.182 | 2023 |